dc.contributor.authorIEEE-
dc.date.accessioned2017-07-14T15:34:51Z-
dc.date.available2017-07-14T15:34:51Z-
dc.date.issued2017-06-
dc.identifier.urihttp://item.bettergrids.org/handle/1001/251-
dc.description.abstractThe IEEE 14-bus test case is a model of the American Electric Power System in 1962. IEEE14 has had many additions over the years: line limits, generator costs, etc. For the PSCOPF problem, a few security contingencies were defined. This is one of the feasible scenarios generated by random perturbation of some of the limits (e.g. on generator power output and branch flows). This problem is small enough that it should not pose any challenge to off-the-shelf optimization solvers, commercial or otherwise. It is composed of 100 scenarios, all known to be feasible, generated by random perturbation of some of the limits (e.g. on generator power output and branch flows). These problems are small enough that they should not pose any challenge to off-the-shelf optimization solvers, commercial or otherwise.en_US
dc.publisherGrid Optimization Competitionen_US
dc.titleIEEE 14-Bus - Phase 0en_US
dc.title.alternativeGAMS Formaten_US
dc.typeGrid Model Dataset Referenceen_US
grid.publisher.urlhttps://gocompetition.energy.gov/competition/current-competitionen_US
grid.formatOtheren_US
grid.buses14en_US
grid.generators5en_US
grid.loads11en_US
grid.formatversionGAMS formaten_US
grid.identifier.urlhttps://gocompetition.energy.gov/sites/default/files/Phase_0_IEEE14.zip-
Appears in Collections:Transmission Steady State



User Comments

Average user rating

0.0 / 5

Rating breakdown

5
80% Complete (danger)
0%
4
80% Complete (danger)
0%
3
80% Complete (danger)
0%
2
80% Complete (danger)
0%
1
80% Complete (danger)
0%

Items in BetterGrids are protected by copyright, with all rights reserved, unless otherwise indicated.