Browsing by Subject Optimization

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z or enter first few letters:  
Showing results 1 to 20 of 137  next >
Issue DateTitleVersionData FormatFeedersLoadsBusesGenerators
27-Oct-2017ACTIVSg10K: A 10,000-bus synthetic grid geolocated in the Western USA10/27/2018POWERWORLD04899100002485
27-Oct-2017ACTIVSg10K: A 10,000-bus synthetic grid geolocated in the Western USA10/27/2018MATPOWER04899100002485
8-Aug-2018ACTIVSg2000: A 2000-bus synthetic grid geolocated in Texas8/8/2018POWERWORLD013502000545
8-Aug-2018ACTIVSg2000: A 2000-bus synthetic grid geolocated in Texas8/8/2018MATPOWER013502000544
16-Jan-2018ACTIVSg200: A 200-bus synthetic grid geolocated in central Illinois1/16/2018POWERWORLD016020049
16-Jan-2018ACTIVSg200: A 200-bus synthetic grid geolocated in central Illinois1/16/2018MATPOWER0020049
22-Sep-2017ACTIVSg200: A 200-bus synthetic grid geolocated in central Illinois9/22/2018POWERWORLD020650090
5-Apr-2018ACTIVSg25K: A 25,000-bus synthetic grid geolocated in the Mid Atlantic USA4/5/2018POWERWORLD09441250004834
5-Apr-2018ACTIVSg25K: A 25,000-bus synthetic grid geolocated in the Mid Atlantic USA4/5/2018MATPOWER09441250004834
22-Sep-2017ACTIVSg500: A 500-bus synthetic grid geolocated in South Carolina9/22/2018PTI PSSE020650090
22-Sep-2017ACTIVSg500: A 500-bus synthetic grid geolocated in South Carolina9/22/2018MATPOWER020650090
13-Aug-2018ACTIVSg70K: A 70,000-bus synthetic grid geolocated in the Eastern USA8/13/2018POWERWORLD0381817000010390
13-Oct-2018ACTIVSg70K: A 70,000-bus synthetic grid geolocated in the Eastern USA8/13/2018MATPOWER0381817000010390
16-Mar-2018Challenging Transmission Level Test Cases for Power System Studiesv1Unspecified0000
2020MIOHIN Synthetic Grid Model1.0Unspecified0740910192722
2-Apr-2018nmwc118-MATPOWER0011854
2-Apr-2018nmwc24-MATPOWER002433
2-Apr-2018nmwc3acyclic_connected_feasible_space-MATPOWER2032
2-Apr-2018nmwc3acyclic_disconnected_feasible_space-MATPOWER3032
2-Apr-2018nmwc3cyclic-MATPOWER-032