Item Attributes
TitleSynthetic Gas-Electric Test case for the Travis 150 System
AuthorsBirchfield, Adam
Abu-Khalifa, Y. A.
Issue Date1-Jan-2022
PublisherTexas A&M University
AbstractThis dataset includes a 150 bus synthetic electric test case, corresponding to the Austin-Travis County T&D system, along with the associated 47-node synthetic natural gas test case with 23 loads and 46 pipelines. This system is designed to aid with developing and validating analysis techniques for combined electric-gas systems. [1] Y. A. Abu-Khalifa and A. B. Birchfield, “Techniques for creating synthetic combined electric and natural gas transmission grids,” IEEE Texas Power and Energy Conference, Feb. 2022.
URIhttp://item.bettergrids.org/handle/1001/644
Appears in Collections:Synthetic Data for Power Grid R&D



User Comments

Average user rating

0.0 / 5

Rating breakdown

5
80% Complete (danger)
0%
4
80% Complete (danger)
0%
3
80% Complete (danger)
0%
2
80% Complete (danger)
0%
1
80% Complete (danger)
0%

Items in BetterGrids are protected by copyright, with all rights reserved, unless otherwise indicated.