Full metadata record
DC FieldValueLanguage
dc.contributor.authorBirchfield, Adam-
dc.contributor.authorAbu-Khalifa, Y. A.-
dc.date.accessioned2022-09-06T01:02:19Z-
dc.date.available2022-09-06T01:02:19Z-
dc.date.issued2022-01-01-
dc.identifier.urihttp://item.bettergrids.org/handle/1001/644-
dc.description.abstractThis dataset includes a 150 bus synthetic electric test case, corresponding to the Austin-Travis County T&D system, along with the associated 47-node synthetic natural gas test case with 23 loads and 46 pipelines. This system is designed to aid with developing and validating analysis techniques for combined electric-gas systems. [1] Y. A. Abu-Khalifa and A. B. Birchfield, “Techniques for creating synthetic combined electric and natural gas transmission grids,” IEEE Texas Power and Energy Conference, Feb. 2022.en_US
dc.publisherTexas A&M Universityen_US
dc.titleSynthetic Gas-Electric Test case for the Travis 150 Systemen_US
dc.typeGrid Model Dataseten_US
grid.formatPOWERWORLDen_US
grid.identifier.urlhttps://electricgrids.engr.tamu.edu/synthetic-gas-electric-test-case-for-the-travis-150-system/-
Appears in Collections:Synthetic Data for Power Grid R&D



User Comments

Average user rating

0.0 / 5

Rating breakdown

5
80% Complete (danger)
0%
4
80% Complete (danger)
0%
3
80% Complete (danger)
0%
2
80% Complete (danger)
0%
1
80% Complete (danger)
0%

Items in BetterGrids are protected by copyright, with all rights reserved, unless otherwise indicated.