Full metadata record
DC FieldValueLanguage
dc.date.accessioned2022-10-24T15:38:37Z-
dc.date.available2022-10-24T15:38:37Z-
dc.date.issued2021-05-29-
dc.identifier.urihttp://item.bettergrids.org/handle/1001/653-
dc.description.abstractThe 68-Bus, 16-Machine, 5-Area System is a reduced order equivalent of the inter-connected New England test system (NETS) and New York power system (NYPS), with five geographical regions out of which NETS and NYPS are represented by a group of generators whereas, the power import from each of the three other neighboring areas are approximated by equivalent generator models. This model was created after the 1965 blackouts and represents part of the power network of that region in the 1970s.en_US
dc.publisherTexas A&M Universityen_US
dc.titleNew England 68-Bus Test Systemen_US
dc.typeGrid Model Dataseten_US
grid.formatPTI PSSen_US
grid.buses0en_US
grid.generators0en_US
grid.loads0en_US
grid.feeders0en_US
grid.switches0en_US
grid.nodes0en_US
grid.voltages0en_US
grid.climateZones0en_US
grid.branches0en_US
grid.identifier.urlhttps://electricgrids.engr.tamu.edu/electric-grid-test-cases/new-england-68-bus-test-system/?-
grid.language.sw0en_US
grid.previousVersion.url0en_US
grid.newerVersion.url0en_US
Appears in Collections:Synthetic Data for Power Grid R&D

File Description Size Format Export Browse
233.2 kBArchive


User Comments

Average user rating

0.0 / 5

Rating breakdown

5
80% Complete (danger)
0%
4
80% Complete (danger)
0%
3
80% Complete (danger)
0%
2
80% Complete (danger)
0%
1
80% Complete (danger)
0%

Items in BetterGrids are protected by copyright, with all rights reserved, unless otherwise indicated.