Item Attributes
TitleRestoration Data and Scenarios for ACTIVSg200
AuthorsBirchfield, Adam
Issue Date29-Sep-2021
PublisherTexas A&M University
AbstractA 200-bus synthetic grid (ACTIVSg200) with associated datasets appropriate for blackstart restoration scenarios, including definitions of critical loads, blackstart units, cranking capabilities, and ramp rates. In addition, four scenarios are provided with varying levels of renewable availability and outages of units and devices. [1] A. B. Birchfield, “Graph decomposition for constructing blackstart restoration strategies in benchmark cases,” Power Systems Computation Conference (PSCC), Porto, Portugal, June 2022.
URIhttp://item.bettergrids.org/handle/1001/626
Appears in Collections:Synthetic Data for Power Grid R&D

File Description Size Format Export Browse
531.51 kBArchive
685.09 kBArchive


User Comments

Average user rating

0.0 / 5

Rating breakdown

5
80% Complete (danger)
0%
4
80% Complete (danger)
0%
3
80% Complete (danger)
0%
2
80% Complete (danger)
0%
1
80% Complete (danger)
0%

Items in BetterGrids are protected by copyright, with all rights reserved, unless otherwise indicated.