Item Attributes
TitleIlliniGMD 42 HEMP
Issue Date10-Dec-2017
PublisherTexas A&M University
AbstractThe IlliniGMD 42 bus case models a 500/345/161 kV fictitious network. The scenario starts with the system in a reasonable operating condition. Then, within a few seconds a high altitude electromagnetic pulse (HEMP) E3 blast strikes the system, inducing large amounts of geomagnetically induced currents (GICs) in the system. The scenario goal is to operate the system for five minutes without a system wide blackout. The key system controls are either opening loads or opening lines. Beware of generators tripping due to over excitation and frequency violations and loads tripping due to voltage violations! Without intervention, the system will experience a blackout in about 70 seconds.
URIhttp://item.bettergrids.org/handle/1001/617
Appears in Collections:Synthetic Data for Power Grid R&D

File Description Size Format Export Browse
198.52 kBArchive


User Comments

Average user rating

0.0 / 5

Rating breakdown

5
80% Complete (danger)
0%
4
80% Complete (danger)
0%
3
80% Complete (danger)
0%
2
80% Complete (danger)
0%
1
80% Complete (danger)
0%

Items in BetterGrids are protected by copyright, with all rights reserved, unless otherwise indicated.