Full metadata record
DC FieldValueLanguage
dc.contributor.authorGo Competition Team-
dc.date.accessioned2017-07-14T19:54:17Z-
dc.date.available2017-07-14T19:54:17Z-
dc.date.issued2017-06-
dc.identifier.urihttp://item.bettergrids.org/handle/1001/261-
dc.description.abstractThis dataset is composed of 100 scenarios, all known to be feasible, based on the 1996 update (“The IEEE Reliability Test System - 1996”, IEEE Transactions on Power Systems, Vol. 14, No. 3, August 1999) of the IEEE Reliability Test System, originally published in 1979, modified by removing one line, linking buses 121 and 325, in order to generate a distinct power system network model. The scenarios were generated by random perturbations of some of the limits (e.g. on generator power output and branch flows) taken from the spring windy day 1 data..en_US
dc.publisherGrid Optimization Competitionen_US
dc.titleModified RTS96 - Phase 0en_US
dc.typeGrid Model Dataset Referenceen_US
grid.publisher.urlhttps://gocompetition.energy.gov/competition/current-competition?page=dataen_US
grid.formatMatPoweren_US
grid.generators33en_US
grid.identifier.urlhttps://gocompetition.energy.gov/sites/default/files/Phase_0_Modified_RTS96.zip-
grid.identifier.urlhttp://ieeexplore.ieee.org/abstract/document/780914/-
Appears in Collections:Transmission Steady State



User Comments

Average user rating

0.0 / 5

Rating breakdown

5
80% Complete (danger)
0%
4
80% Complete (danger)
0%
3
80% Complete (danger)
0%
2
80% Complete (danger)
0%
1
80% Complete (danger)
0%

Items in BetterGrids are protected by copyright, with all rights reserved, unless otherwise indicated.